Notice of application for:

AN INTEGRATED ENVIRONMENTAL AUTHORISATION AND WATER USE LICENSE APPLICATION FOR THE PROPOSED BIERSPRUIT OPENCAST AT THE AMANDELBULT MINE, WITHIN THE THABAZIMBI LOCAL MUNICIPALITY, LIMPOPO PROVINCE.

Rustenburg Platinum Mines proposes extending the existing mining operations through the mining of shallow Merensky and UG2 reefs within the Amandelbult Mining Right Boundary. The proposed project will be referred to as the Bierspruit Opencast project and is located to the east of the Tumela mine 16 West Shaft near Thabazimbi in the Limpopo Province, within the Amandelbult mining complex.  The two main areas are dissected by a gravel road linking the R510 to areas northwest of the planned opencast area. A culvert structure allows crossing of the Bierspruit between the two planned opencast areas.

The Environmental Management Programme report (EMPr) Addendum was initially approved by the Department of Mineral Resources: Directorate Mineral Development: Limpopo Region in 2002 (Reference number: 6/2/2/48). The Bierspruit Opencast project is motivated by a need to ensure continuity in operations, which shifted the focus from underground to opencast mining at Anglo’s Amandelbult Complex.  This project will enable Anglo to economically extract reef remnants of easily accessible Platinum Group Elements (PGE) ounces from previously mined and backfilled opencast pits.

The proposed mining operations are expected to consist of opencast pits for strip mining; overburden stockpile areas; pollution control dams; a topsoil stockpile area; a mobile crusher (at the existing Tumela 10 West Raise-bore) and ore stockpile area; internal access and haul roads for the removal of ore from within the pit; storm water management measures around excavated and infrastructure areas in the form of berms to be constructed from overburden material; contractor’s camp (inclusive of parking); and perimeter fencing around the proposed mining area.

The proposed Bierspruit Opencast project will be located on the Remainder of the farms Schildpadnest 385 KQ and Zwartkop 369 KQ.

For more information, to register as an Interested and Affected Party (I&AP) or to submit comments, please contact us between Monday, 5 December 2022 and Monday, 30 January 2023 by completing the form below.

Draft scoping report

Bierspruit Draft Scoping Report

APPENDIX 1: EAP Qualifications and Registration

EAPASA EAP Certificate – N Whitehorn

GISSA – N Whitehorn

Membership Confirmation

BA Geography – N Whitehorn

BA (Hons) Geography & Env Management – N Whitehorn

APPENDIX 2: CV of EAP

CV – Natanya Whitehorn

APPENDIX 3: Project Maps

Locality

Property Boundaries

Mining areas

APPENDIX 4: Design Drawings

P052 – 01

P052 – 02

P052 – 03

P052 – 04

P052 – 05

P05 2- 10 | Overall Site Development

P052 – 11 West Stockpile Platform GA

P052 – 12 West Stockpile Platform layout

P052 – 13 West PCD Layout

P052 – 14 West Stockpile platform Final Landform

P052 – 15 East Stockpile Platform GA

P052 – 16 East Stockpile Platform Layout

P052 – 17 East PCD Layout

P052 – 18 East Stockpile Platform Final Landform

APPENDIX 5: Public Participation Records

505576 – Bierspruit BID Afrikaans

505576 – Bierspruit BID English

505576 – Bierspruit BID IsiXhosa

505576 – Bierspruit BID Setswana

505576 – Bierspruit I&AP Letter Afrikaans

505576 – Bierspruit I&AP Letter English

505576 – Bierspruit I&AP Letter IsiXhosa

505576 – Bierspruit I&AP Letter Setswana

505576 – Bierspruit Newspaper Afrikaans

505576 – Bierspruit Newspaper English

505576 – Bierspruit Newspaper  IsiXhosa

505576 – Bierspruit Newspaper Setswana

505576 – Bierspruit Site Notice Afrikaans

505576 – Bierspruit Site Notice English

505576 – Bierspruit Site Notice IsiXhosa

505576 – Bierspruit Site Notice Setswana

APPENDIX 6: Impact Assessment Methodology

Impact Assessment Methodology

REGISTRATION AND COMMENTS:

contact-us