FINAL BASIC ASSESSMENT REPORT: MACASSAR WASTEWATER TREATMENT WORKS, CAPACITY EXTENSION AND ASSOCIATED INFRASTRUCTURE REFURBISHMENT, WESTERN CAPE
Macassar Wastewater Treatment Works, Capacity Extension and Associated Infrastructure Refurbishment, City of Cape Town, Western Cape
Project Proposal:
On the 07 July 2016, the Department of Environmental Affairs and Development Planning issued an Environmental Authorisation (EA) 16/3/1/1/A3/39/2078/14 to the City of Cape Town approving the proposed upgrade and expansion of the Macassar Wastewater Treatment Works (WWTW) and associated infrastructure. However, due to the time that has passed since the approval in 2016, new design engineers have been appointed to finalise the detailed design. The design engineers have identified alternative technology options that will enable the works to run more efficiently and improve the quality of the effluent being discharged to the estuary.
The proposed revision to the design upgrades will require the clearance of more than 1ha of indigenous vegetation, which includes Endangered Cape Flats Dune Strandveld vegetation. Therefore, Listing Notice 1, Activity 27 and Listing Notice 3 Activity 12 is being applied for.
Legal Framework:
To seek environmental authorisation, a Basic Assessment Reporting (BAR) process for the proposed works is required in terms of the National Environment Management Act (NEMA, Act No. 107 of 1998, as amended) and the 2014 Environmental Impact Assessment (EIA) Regulations (as amended). An Application for Environmental Authorisation (EA) has been submitted to the Western Cape Department of Environmental Affairs and Development Planning (DEA&DP).
DEA&DP Ref Number: 16/3/3/1/A3/39/2054/24
Available Information:
Final BAR and Comments and Response Report. (CRR)
| Contact Person: | Corlie Steyn | Email: | PPP@zutari.com |
| Telephone: | 044 805 5400 | Postal: | PO Box 509, George, 6530 |
| Fax: | 044 873 5843 | ||
| Disclaimer: Zutari places a high premium on the privacy & personal information of our stakeholders. Please note that, as a Registered I&AP in terms of the Environmental Impact Assessment (EIA) Regulations, 2014, your personal details including your name, contact details and address is recorded into a register. The processing of personal information is subject to the Protection of Personal Information Act (POPIA), Act No. 4 of 2013, which came into effect on the 1st of July 2021. | |||
Basic Assessment Report (Final BAR)
Basic Assessment Report (Final BAR)
Appendix A: Maps
Appendix A3: Map with the GPS co-ordinates for linear activities
Appendix B: Plans
Appendix B1 | Site Development Plan
B1:1 Engineer Site Plan 1 of 2
B1:2 Engineer Site Plan 2 of 2
B1.3 Property Boundaries
B1.3 Site establishment and stockpile area
B1.4 Roads and Servitudes
B1.5 Environmental Sensitivities
B1.6.1 Flood lines
B1.6.2 Floodlines 1 3000
B1.7 Contours
Appendix B2 | A map of appropriate scale, which superimposes the proposed development and its associated structures and infrastructure on the environmental sensitivities of the preferred site, indicating any areas that should be avoided, including buffer areas.
B2.0 Sensitivity maps
B2:1a Biodiversity map 1:25,000
B2:1b Biodiversity sensitivity map 1:7,000
B2:1c Biodiversity and Freshwater 32m buffer map
B2.2 Freshwater sensitivity map 1:12,000
B2.3 Heritage & Palaeo sensitivity map 1:12,000
B2.4 Combined sensitivity map 1:12,000
B2.5 CBA Protected area
B2.6 All sensitivities and buffers map 1;20,000
Appendix C: Photographs
C1: Photographs – Dated April 2022
C2: Map with vantage points
C3 Photographs matching vantage points
Appendix D: Biodiversity overlay map
D1: Biodiversity sensitivity map
D.2 Biodiversity map – zoomed
Appendix E: Permit(s) / license(s) / exemption notice, agreements, comments from State Department/Organs of state and service letters from the municipality.
E1: Final comment/ROD from HWC
E1.1: Section 38 Response to NID
E1.2: Response from Stephanie Barnardt from HWC
E1.3: HWC Consultation Letter
E1.4: FC Dec 2024
E2: Comment & Feedback: Ismat Adams
E3.1: Email WUL Amend to DWS
E3.2: Amendment template
E3.3: Proof to DWS
E3.4:DWS
E10: Effort to Contact
E11: Pollution
E13: Air
E14: DEADP
E15: Erf
E15.1: Final comment from CCR Biodiversity
E16: Confirmation of services (water, electricity, sewage, solid waste management)
E20: Proof of agreement/TOR of the specialist studies conducted. – Refer also to the section in each Specialist Study pertaining to the TOR
E20.1: Sub-consultant agreement – Heritage
E20.2: Sub-consultant agreement – Freshwater & Botanical
E20.3: Sub-consultant agreement – Agricultural
E20.4: Sub-consultant agreement – Terrestrial
E20.5: Sub-consultant agreement – Biodiversity offset
E21: Proof of land use rights
E21.1: Landuse ERF703 Re
E21.2: Landuse ERF1205
E21.3: Zoning Map
E21.4: Zoning map including cable
Appendix F: Public participation information
F0.1 Macassar PPP Report – Second round
F1: Meeting record
F2: Notifications
F2.1 Email notifications
F2.1.1 Proof of Postage
F2.2 Reminder email
F2.3 Proof of postage – Second round
F2.4 Email notifications – Second round
F2.5 Reminder email – Second round
F3.1 Proof of advert
F3.2 Proof of advert 2
F3.3 Proof of advert 3
F3.4 Advert – Second round
F4.1 Signed Transmittal
F4.2 Signed Transmittal – Second PPP
F4.3 Transmittal – Second round
F5 Offset Site Visit Register
F6: Proof of Advert – Public meeting
F7.1: Presentation
F7.2: Meeting Register
F7.3: Engagement meeting Second round
F7.4: Register – Public meeting
F.8 Final Comments and Responses Report
F9: Final I&AP Database
Appendix G: Specialist reports
G.0 Specialists
G.1 Agricultural Compliance Statement
G.2 Terrestrial Biodiversity Assessment
G.3 Heritage Impact Assessment
G3.1: Heritage Impact Assessment
G3.2: Paleontology Assessment
G3.3: Response to Notice of Intent
G.4 Freshwater Impact Assessment
G.5 Ecological Impact Assessment
G.6 Geotechnical Report
G.7 Defence Compliance Statement
G8.1 Biodiversity Offset Memo
G8.2 Macassar WWTW Biodoversity Offset Memo
G8.3 Biodiversity Offset Strategy
G8.4 Biodiversity Offset Agreement
G8.5 Draft offset Report
G8.6 Biodiversity Offset Report
G8.7 Email CCT Biodversity Comments incorporated
G8.8 Offset BMB Letter
Appendix H: EMPr
H.0: Macassar Water Treatment Works Environmental Management Plan
H.1 EMPr Final
H1.1 App C No-Go Zones
H1.2 App C No-Go Zones 2
H1.3 DRG CC 002 New site layout
H1.4 DRG CC 0003 New site layout
Appendix I: Screening Tool Report
I.0 Screening tool report
I.1 Screening tool
Appendix J: Impact & Risk Assessment
The Impact and Risk Assessment Alternative
Appendix K: Environmental Management Guideline
Appendix L: Existing EA, DEA&DP Communication and Pre-application meeting record
Existing EA, DEA&DP Communication and Pre-application meeting Record
Appendix M: Site Sensitivity Verification Report
Macassar Site Sensitivity Verification Report.
Appendix N: Footprint Comparisons
Motivational comparison Revised upgrade design and authorised upgrade
Appendix O: Climate Change
Appendix P: Final Basic Assessment Report (BAR)
P.1 Final Basic Assessment Application Declaration
P.2 Declaration of the EAP
P.3 STS B Bleuler
P.4 ASHA Consulting
P.5 Blu Science
P.6 Dr Boucher
P.7 Graham Avery
P.8 Nicke Helme Botanical Surveys
P.9 SoilZA (Johann Lanz)
P.10 STS C Lamb
P.11 STS – S van Staden
P.12 STS SL Daniels
P.13 STS Corlie Steyn CV
Appendix Q: Property sizes for all sites